Tender workspace
Construction of Therapeutic/Rehabilitation Garden for Redevelopment of Kwai Chung Hospital at 3-15 Kwai Chung Hospital Road, New TerritoriesOriginal
Share tender
Architectural Services Department · Construction of Therapeutic/Rehabilitation Garden for Redevelopment of Kwai Chung Hospital at 3-15 Kwai Chung Hospital Road, New Territories · Contract / tender number: SS R506 · Active · Closing date: 2026-11-27 12:00
Tender information
- Contract / tender number
- SS R506
- Closing date / Award
- 2026-11-27 12:00
- Contractor
- —
- Amount
- —
- Issuing organisation
- 建築署 Architectural Services Department
- Update
- 10/11/2026 07:47:34
TENDER BRIEF · WITH SOURCES
Know the requirements. Plan your next step.
The Architectural Services Department, by selective tendering, invites tenders for the construction of a therapeutic/rehabilitation garden for psychiatric patients under the redevelopment of Kwai Chung Hospital (comprising sensory gardens, a physical training path, a covered amphitheatre, a labyrinth, a toilet block and perimeter walls, together with demolition of Block L/M), with a site area of about 4,000 square metres, scheduled to commence in 2 2027 and complete in 11 2028. Submission must be made electronically via e-TS(WC), with a deadline of 2026-11-27 12:00 noon. Tenderers must be Group B or Group C contractors for Buildings category on the List of Approved Contractors and meet the past contract requirements; those not yet on the list must apply and obtain approval by 2026-10-27. This summary is based only on the provided notice excerpt; the complete tender documents and all addenda have not been verified.
AI summary of the official notice and document excerpts obtained. The complete tender pack and all addenda have not been verified. Check the original terms.
- Tender reference
- Contract No. SS R506Official source ↗
- Closing date / time
- 2026-11-27 12:00 (if a tropical cyclone signal No. 8 or above / black rainstorm warning / "extreme conditions after super typhoons" is in force between 9:00 a.m. and 12:00 noon on that day, it will be extended to 12:00 noon on the first working day after the signal is cancelled, Saturday not counted)Official source ↗Official source ↗
1. Scope of Works / Supply
Construction of a therapeutic/rehabilitation garden for psychiatric patients, comprising sensory gardens, a physical training path, sitting-out areas, an exercise corner with fitness equipment, a continuous path…Official source ↗
Also includes demolition of the existing Block L/M of Kwai Chung Hospital, interfacing works with the adjoining area, and all associated building services installation, drainage and external works. The site area is…Official source ↗
The works are scheduled to commence in 2 2027 and for completion in 11 2028. The Estimated quantity column of the notice is stated as Not applicable.Official source ↗
2. Qualification Threshold
Selective tendering is adopted: tenderers must be contractors on the List of Approved Contractors for Public Works in Group B or Group C for Buildings category; in the case of a joint venture, the lead participant or…Official source ↗
Read the details before you decide.
Sign in free for eligibility, submission requirements, risks and source excerpts.
Sign in free to continueNo subscription required.
Related tenders
Related tenders from the same organisation
Other public records from the same department or category.
- Official sourceDesign and Construction of Sha Tau Kok Control Point and Associated WorksActive · Works (Gazette) · 2027-01-08 12:00
- Official sourceTerm Contract for the Alterations, Additions, Maintenance and Repair of Buildings and Lands and Other Properties for which the Architectural Services Department (Property Services Branch) is Responsible [service areas: Wong Tai Sin and Sha Tin]Closed · Works (Gazette) · 2026-10-09 12:00
- Official sourceTerm Contract for the Alterations, Additions, Maintenance and Repair of Buildings and Lands and Other Properties for which the Architectural Services Department (Property Services Branch) is Responsible [service areas: Sham Shui Po, Tsuen Wan and Kwai Tsing]Closed · Works (Gazette) · 2026-10-09 12:00
- Official sourceTerm Contract for the Alterations, Additions, Maintenance and Repair of Buildings and Lands and Other Properties for which the Architectural Services Department (Property Services Branch) is Responsible [service areas: Kowloon City, Sai Kung and Outlying Islands (Sai Kung)]Closed · Works (Gazette) · 2026-10-09 12:00
- Official sourceTerm Contract for the Alterations, Additions, Maintenance and Repair of Buildings and Lands and Other Properties for which the Architectural Services Department (Property Services Branch) is Responsible [service areas: Kwun Tong, Yau Ma Tei, Tsim Sha Tsui and Mong Kok]Closed · Works (Gazette) · 2026-10-09 12:00
- Official sourceConstruction of a 30-classroom Secondary School at Area 89 (Southern Side), Tung ChungClosed · Works (Gazette) · 2026-07-24 12:00