Tender workspace
Contract No. DE/2025/13 Shek Wu Hui Effluent Polishing Plant Stage 2 – E&M WorksOriginal
Share tender
Drainage Services Department · Contract No. DE/2025/13 Shek Wu Hui Effluent Polishing Plant Stage 2 – E&M Works · Contract / tender number: DE/2025/13 · Active · Closing date: 2026-12-31
Tender information
- Contract / tender number
- DE/2025/13
- Closing date / Award
- 2026-12-31
- Contractor
- —
- Amount
- —
- Issuing organisation
- 渠務署 Drainage Services Department
- Update
- 9/10/2026 01:01:52
Read the highlights, then check the official requirements
The Drainage Services Department is tendering for the electrical and mechanical works for Shek Wu Hui Effluent Polishing Plant Stage 2. The scope covers design, supply, installation, testing and…
Based on the official material obtained. The full tender pack and all attachments have not been verified.
Read the AI summaryAI TENDER SUMMARY
This tender, at a glance
The Drainage Services Department is tendering for the electrical and mechanical works for Shek Wu Hui Effluent Polishing Plant Stage 2. The scope covers design, supply, installation, testing and…
Based on the official notice and document excerpts obtained. Check the originals: the full tender pack and all addenda have not been verified.
- Closing Date/Time
- 2026-12-31 (Thursday) 12:00 noonOfficial source ↗
- Tendering Method
- Selective tendering; must be a confirmed contractor on the List of Approved Suppliers under the category "Electrical and Mechanical Installation for Sewage Treatment and Screening Plant", or a joint venture with local and/or overseas contractors whose lead participant or major shareholder is such a confirmed contractor, and must meet the other conditions for participationOfficial source ↗
Scope of Works/Supplies
Design, supply, installation, testing and commissioning of electrical and mechanical works for sewage and sludge treatment facilities, as well as associated buildings services.Official source ↗
Installation, testing and commissioning of the biological treatment system and associated tertiary treatment system designed and supplied under separate Contract DE/2026/03 "Shek Wu Hui Effluent Polishing Plant Stage 2…Official source ↗
The works are scheduled to commence in 3 2027 and will take about 54 months to complete; the notice states the Estimated Quantity is Not applicable.Official source ↗
Qualification Thresholds
Selective tendering is adopted: tenderers must be confirmed contractors on the List of Approved Suppliers of Materials and Specialist Contractors for Public Works under the category "Electrical and Mechanical…Official source ↗
FREE MEMBERSHIP
Sign in free to read more tender highlights.
Bilingual summaries, saved tenders and alerts, in one free account.
Drainage Services Department · Other tenders
- Official sourceProvision of Membrane Filtration Systems for Tanks No. 1 and No. 6 at Shek Wu Hui Sewage Treatment WorksActive · Works Contract · 2026-11-27
- Official sourceTerm Contract for Provision of Sampling and Analyzing of Samples for Various Sewage Treatment Facilities in Urban Area, Lantau and Outlying Islands to the Drainage Services Department (2027-2030)Closed · Works Contract · 2026-10-30
- Official sourceReplacement of Energy Dissipating Inlet (EDI) for Final Sedimentation Tank (FST) Nos. 7 to 12 in Stage IV of Tai Po Sewage Treatment WorksClosed · Works Contract · 2026-10-30
- Official sourceReplacement of Electrical and Mechanical Installation at Shui Wai Stormwater Pumping StationClosed · Works Contract · 2026-10-30
- Official sourceShek Wu Hui Effluent Polishing Plant Stage 2 - Provision of Biological Treatment System"Closed · Works Contract · 2026-10-16
- Official sourceUpgrading Works of Sludge Dewatering Facilities at Siu Ho Wan Sewage Treatment Works (Phase 2)Closed · Works Contract · 2026-08-14