更新於 30/7/2026 01:02:22
政府工務及公營機構公開工程合約招標與批出紀錄。 目前顯示 100 筆。
| 已截止 |
| Landslip Prevention and Mitigation Programme, Ground Investigation Term Contract (2026-2029), Contract 2 |
| GE/2026/15 |
| 土木工程拓展署 |
| 已截止 | Replacement of Tunnel Ventilation System at Aberdeen Tunnel | 1425EM26W | 機電工程署 |
| 已截止 | Supply of Cattle Transport Vehicle to the Electrical and Mechanical Services Department, the Vehicle to be ready for use within 18 months from the contract date. | EMSSSD0825 | 機電工程署 |
| 已截止 | Provision of Covers to Primary Sedimentation Tanks at Sha Tin Sewage Treatment Works | DC/2009/26 | 渠務署 |
| 已截止 | Supply and Installation of One Set of Sludge Dewatering Filter Press and Associated Sub-systems at Yuen Long Sewage Treatment Works | DE/2009/19 | 渠務署 |
| 已截止 | Supply and Installation of Electrical and Mechanical Equipment for Kau Hui No. 2 Sewage Pumping Station at Yuen Long, N.T. | DE/2009/08 | 渠務署 |
| 已截止 | Supply and Installation of Electrical and Mechanical Equipment for Tai Po Sewage Treatment Works Stage 5 Phase 2B | DE/2009/09 | 渠務署 |
| 已截止 | Harbour Area Treatment Scheme Stage 2A Upgrading Works at Stonecutters Island Sewage Treatment Works – Sludge Dewatering Facilities | DC/2009/17 | 渠務署 |
| 已截止 | North District and Tolo Harbour Regional Sewerage – Upgrading of Sewage Pumping Stations and Trunk Sewers | DC/2009/14 | 渠務署 |
| 已截止 | Supply and Installation of an Additional Combined Heat and Power Generating Set at Shek Wu Hui Sewage Treatment Works | DE/2009/01 | 渠務署 |
| 已截止 | Retrofitting Works for Existing Sludge Dewatering Centrifuges at Stonecutters Island Sewage Treatment Works | DE/2009/16 | 渠務署 |
| 已截止 | Kai Tak Nullah Improvement Works at Prince Edward Road East | DC/2010/03 | 渠務署 |
| 已截止 | Supply and Installation of a Biogas Desulphurization System at Shatin Sewage Treatment Works | : DE/2009/17 | 渠務署 |
| 已截止 | Provision of Interception Facilities at Jordan Valley Box Culvert | DC/2009/21 | 渠務署 |
| 已截止 | Construction of Intercepting Drains at Shun Tat Street, Tuen Mun and Remaining Works at Sha Po Tsuen, Yuen Long. | DC/2009/25 | 渠務署 |
| 已截止 | Supply and Installation of Electrical and Mechanical Equipment for Expansion of Ha Tsuen Sewage Pumping Station and Shui Tsiu San Tsuen Road Sewage Pumping Station | DE/2009/10 | 渠務署 |
| 已截止 | Supply and Installation of Electrical and Mechanical Equipment for Ting Kok Road Sewage Pumping Station No.6. | DE/2010/04 | 渠務署 |
| 已截止 | Construction of Sewage Treatment Works at Yung Shue Wan and Sok Kwu Wan | DC/2009/13 | 渠務署 |
| 已截止 | Supply and Installation of Electrical and Mechanical Equipment for Upgrading of Tai O Tai Ping Street Floodwater Pumping Station | DE/2010/03 | 渠務署 |
| 已截止 | Supply and Installation of Odour Control Facilities for Primary Sedimentation Tanks in Shatin Sewage Treatment Works | DE/2009/22 | 渠務署 |
| 已截止 | Harbour Area Treatment Scheme Stage 2A Upgrading Works at Stonecutters Island Sewage Treatment Works – Main Pumping Station, Sedimentation Tanks and Ancillary Facilities | DC/2009/10 | 渠務署 |
| 已截止 | Construction of Lau Fau Shan Trunk Sewerage and Drainage | DC/2011/02 | 渠務署 |
| 已截止 | Tuen Mun Village Sewerage and Trunk Sewers at Pillar Point | DC/2010/01 | 渠務署 |
| 已截止 | Term Contract for Sampling and Analysing of Wastewater for Various Sewage Treatment Facilities in Urban Area, Lantau and Outlying Islands (2011-2013) | DE/2010/10 | 渠務署 |
| 已截止 | Harbour Area Treatment Scheme Stage 2A - Upgrading of Preliminary Treatment Works at Sandy Bay, Cyberport, Wah Fu, Aberdeen and Ap Lei Chau | DC/2009/24 | 渠務署 |
| 已截止 | Sewerage Upgrading Works in Tai Lam Centre for Women and Other DSD Facilities and Village Sewerage in Sha Tau Kok | DC/2011/03 | 渠務署 |
| 已截止 | Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Tung Tau II Estate | DC/2011/04 | 渠務署 |
| 已截止 | Castle Peak Road Trunk Sewer and Tuen Mun Village Sewerage | DC/2014/01 | 渠務署 |
| 已截止 | Sewerage in Ping Kong, Fu Tei Pai and Tai Wo | DC/2010/10 | 渠務署 |
| 已截止 | Upgrading of Central and East Kowloon Sewerage – Phase 2 | DC/2010/06 | 渠務署 |
| 已截止 | Provision of Hydro Turbine Facilities at Stonecutters Island Sewage Treatment Works | DE/2014/04 | 渠務署 |
| 已截止 | Harbour Area Treatment Scheme Stage 2A Upgrading Works at Stonecutters Island Sewage Treatment Works – Effluent Tunnel and Disinfection Facilities | DC/2009/18 | 渠務署 |
| 已截止 | Construction of Upgrading Works for DSD SIMAR Slopes/ Retaining Walls under Preventive Maintenance Programme | DC/2013/05 | 渠務署 |
| 已截止 | Provision of Electrical and Mechanical Facilities for the Upgrading Works of Two Primary Sludge Pumps at Unit 2 & Unit 3 of Sha Tin Sewage Treatment Works | DE/2014/06 | 渠務署 |
| 已截止 | Renewal of Rising Main in Northeast New Territories | DC/2014/02 | 渠務署 |
| 已截止 | Advance Works for Shek Wu Hui Sewage Treatment Works – Further Expansion Phase 1A and Sewerage Works at Ping Che Road | DC/2013/09 | 渠務署 |
| 已截止 | Pak Hok Lam Trunk Sewer and Sha Tau Kok Village Sewerage | DC/2010/09 | 渠務署 |
| 已截止 | Term Contract for Landscaping and Greening Maintenance Works at Sewage Treatment and Flood Protection Facilities (2011 – 2013) | DE/2010/09 | 渠務署 |
| 已截止 | Supply and Installation of E&M Equipment for Shatin Main Sewage Pumping Station | DE/2010/01 | 渠務署 |
| 已截止 | Photovoltaic System at the Siu Ho Wan Sewage Treatment Works and Three Energy-related Studies | DE/2014/03 | 渠務署 |
| 已截止 | Term Contract for Dewatered Sludge Collection and Disposal Services at Stonecutters Island Sewage Treatment Works (2011 – 2013) | DE/2011/02 | 渠務署 |
| 已截止 | Drainage Maintenance and Construction in Mainland South Districts (2011 - 2015) | DC/2011/01 | 渠務署 |
| 已截止 | Drainage Improvement Works in Shuen Wan and Shek Wu Wai | DC/2010/02 | 渠務署 |
| 已截止 | Harbour Area Treatment Scheme Stage 2A - Upgrading of Preliminary Treatment Works at North Point, Wan Chai East and Central | DC/2009/23 | 渠務署 |
| 已截止 | Reprovisioning of Boundary Patrol Road and Associated Security Facilities between Ping Yuen River and Pak Fu Shan and Drainage Works in North District | DC/2011/06 | 渠務署 |
| 已截止 | Supply and Installation of a Combined Heat and Power Generator Set at Shatin Sewage Treatment Works | DE/2009/18 | 渠務署 |
| 已截止 | Provision of Electrical and Mechanical Equipment for Tuen Mun Area 54 Sewage Pumping Station | DE/2013/10 | 渠務署 |
| 已截止 | Supply and Installation of an Additional Combined Heat and Power Generation System at Tai Po Sewage Treatment Works | DE/2010/07 | 渠務署 |
| 已截止 | Supply and Installation of Electrical and Mechanical Equipment for the Chinese University Sewage Pumping Station | DE/2010/14 | 渠務署 |
| 已截止 | Construction of Trunk Sewers underneath Channels in Sha Tin and Village Sewerage | DC/2010/05 | 渠務署 |
| 已截止 | Drainage improvement works in Pok Fu Lam Road, Mount Butler and Happy Valley | DC/2010/07 | 渠務署 |
| 已截止 | Provision of Electrical and Mechanical Facilities for the Upgrading Works of Effluent Pump No.3 at Effluent Pumping Station of Sha Tin Sewage Treatment Works | DE/2014/05 | 渠務署 |
| 已截止 | Drainage Maintenance and Construction in Mainland North Districts (2015 - 2019) | DC/2013/07 | 渠務署 |
| 已截止 | Term Contract for Waste Disposal and Minor Civil Engineering Works at Various Sewage Treatment Works and Pumping Stations in the New Territories (2011-2014) | DE/2011/01 | 渠務署 |
| 已截止 | Supply and Installation of Water Reclamation Facility in Tai Po Sewage Treatment Works | DE/2011/04 | 渠務署 |
| 已截止 | Term Contract for Inspection, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations (2010 – 2012) | DE/2010/06 | 渠務署 |
| 已截止 | Lam Tsuen Valley Sewerage – Village Sewerage, Stage 1 | DC/2011/05 | 渠務署 |
| 已截止 | Engineering Inspection for Underground Sewers | DC/2015/03 | 渠務署 |
| 已截止 | Provision of Electrical and Mechanical Facilities for Shek Wu Hui Sewage Treatment Works – Further Expansion Phase 1A – Advance Works and Ng Chow South Road Sewage Pumping Station | DE/2014/01 | 渠務署 |
| 已截止 | Provision of Electrical and Mechanical Facilities for Eight Sewage Pumping Stations in the North and Tai Po Districts, N.T. | DE/2013/06 | 渠務署 |
| 已截止 | Improvement Works on Gasholder No.3 at Shatin Sewage Treatment Works | DE/2015/05 | 渠務署 |
| 已截止 | Term Contract for Greening, Landscaping Works and Establishment Works at Sewage Treatment and Flood Protection Facilities under Sewage Treatment Division 2 (2016-2019). | DE/2016/06 | 渠務署 |
| 已截止 | Relocation of Sha Tin Sewage Treatment Works to Caverns – Ground Investigation | DC/2015/01 | 渠務署 |
| 已截止 | Upgrading of High Voltage Switchgears and Motor Starters in Cheung Sha Wan Sewage Pumping Station | DE/2015/03 | 渠務署 |
| 已截止 | Term Contract for Inspection, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations | DE/2015/02 | 渠務署 |
| 已截止 | Building and Civil Maintenance and Minor Works to DSD Plants and Facilities (2016-2020) | DC/2016/02 | 渠務署 |
| 已截止 | Minor Drainage Improvement Works in Northern Hong Kong Island and North District | DC/2015/05 | 渠務署 |
| 已截止 | Upgrading of Kwun Tong Preliminary Treatment Works | DE/2017/01 | 渠務署 |
| 已截止 | Improvement Works of Rotating Biological Contactors (RBC) in Ma Wan Sewage Treatment Works | DE/2015/06 | 渠務署 |
| 已截止 | Provision of Electrical and Mechanical Equipment for Detritor Nos. 1 and 2 of To Kwa Wan Preliminary Treatment Works | DE/2016/03 | 渠務署 |
| 已截止 | Rehabilitation of Trunk Sewers in Kowloon, Shatin and Sai Kung | DC/2017/02 | 渠務署 |
| 已截止 | Construction of an Additional Sewage Rising Main between Tung Chung and Siu Ho Wan and Associated Works | DC/2016/01 | 渠務署 |
| 已截止 | Provision of Operation and Maintenance Service for Various Sewage Treatment and Stormwater Facilities (2015-2018) | DE/2015/01 | 渠務署 |
| 已截止 | Enhancement Works for Kwun Tong Sewage Pumping Station | DC/2017/05 | 渠務署 |
| 已截止 | Drainage Maintenance and Construction in Mainland South Districts (2015 - 2019) | DC/2015/02 | 渠務署 |
| 已截止 | Upgrading of West Kowloon and Tsuen Wan Sewerage – Phase 1 | DC/2017/03 | 渠務署 |
| 已截止 | Upgrading of Screw Pumps for To Kwa Wan Preliminary Treatment Works | DE/2017/05 | 渠務署 |
| 已截止 | Provision of an Additional Combined Heat and Power (CHP) Generating System for Shatin Sewage Treatment Works. | DE/2016/10 | 渠務署 |
| 已截止 | Construction of dry weather flow interceptor at Cherry Street box culvert | DC/2017/01 | 渠務署 |
| 已截止 | Term Contract for Waste Disposal and Minor Civil Engineering Works for Various Sewage Treatment Plants and Pumping Stations in Urban Area, Lantau Island and Outlying Islands | DE/2016/04 | 渠務署 |
| 已截止 | Provision of Electrical and Mechanical Equipment for Kau To Sewage Pumping Station | DE/2015/07 | 渠務署 |
| 已截止 | Provision of Deodourizing Systems and Covers for Preliminary Treatment Facilities in Tai Po Sewage Treatment Works | DE/2017/04 | 渠務署 |
| 已截止 | Drainage Maintenance and Construction in Hong Kong Island and Islands Districts (2017 - 2021) | DC/2017/04 | 渠務署 |
| 已截止 | Term Contract for Waste Disposal and Minor Civil Engineering Works at Various Sewage Treatment Works and Pumping Stations in the New Territories (2017-2020) | DE/2016/13 | 渠務署 |
| 已截止 | Relocation of Sha Tin Sewage Treatment Works to Caverns – Pilot Tests for Sewage and Sludge Treatment Processes | DC/2015/04 | 渠務署 |
| 已截止 | Modification Works for Food Waste & Sewage Sludge Anaerobic Co-digestion Pilot Trial at Tai Po Sewage Treatment Works | DE/2016/11 | 渠務署 |
| 已截止 | Provision of High Voltage Electrical Equipment for Stage III of Sha Tin Sewage Treatment Works | DE/2016/02 | 渠務署 |
| 已截止 | Provision of Electrical and Mechanical Facilities for Lok Chui Street, Fu Tei Ha Tsuen and Siu Lam Psychiatric Centre Sewage Pumping Stations | DE/2016/01 | 渠務署 |